- Create a material master with inspection type – 10 , MM01
- Create material as Batch and Strategy MRP in MRP2 — 20
- Configuration : Quality Management -> Quality Inspection -> Inspection at shipping
- Create inspection plan, QP01
- Create Sales Order, VA01
- Run MRP – MD02
- Conver Planned Order to Production Order -> MD04
- MIGO – GR
- Create Delivery wref to sales order, VL01N
- Result recording, QA32
- Usage Decision, QA32
- Create PGI, VL02N
- Monitor Stock Overview, MMBE
Check Material master with inspection type – 10
MM01, 2, 3
Check Batch Management is actived
Maintain configuration in SPRO.
Quality Management – Quality Inspection – Inspection at shipping
Create Inspection Plan – QP01